Unlocking Joy: 50% Off On WordPress Themes Get It Now >

Outer Fan Blade Metal Shaft Assembly Project

Outer Fan Blade Metal Shaft Assembly Project
Supporter
The loading manipulator places the product on the servo transfer platform. The transfer platform moves to the sprue punching position. After the sprue punching is completed, it moves to the buffer pad installation position. The buffer pads are installed in two steps: the front two first, then the rear two. After installation is completed, it moves to the grease application position. After application, the transfer platform runs to the retrieval position, waiting for the manipulator to retrieve. The manipulator retrieves the sprue and products and places the next set of products to be processed. The left and right workstations switch for production.
Supporter
Sign in to download

This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.

Sign In
or
Create free account
31.1K Views
26.3K Downloads

Published:

Mar 05, 2026 11:50 AM

Version:

v1

Category:

Design Software:

File Formats:

Industry Application:

Sharing Level:

jensen.schmitt's items

Similar items

We use cookies to personalize your experience. By continuing to visit this website you agree to our use of cookies

More